The site: The plaza deck and walkways of a Denver-area condominium building.
The loops: PEX tubing was laid in tight loops over the deck, fed from manifold vaults recessed into the deck with copper headers.
The header wall: Supply and return lines run back to a header wall in the parking garage, where every circuit has its own isolation valve and label. A dedicated circulator moves the heated fluid out to the deck.
Proof: The tubing was pressure-tested before the deck was covered.
Location
Denver area
Building
Condominium building
Scope
Plaza deck and walkways
01
Condo Plaza Deck Snowmelt
01
The whole plaza deck from the roof, every loop in place